POLLEN COLLECTION II — New Launch Profile

New Launch Profile Last reviewed

POLLEN COLLECTION II sits in District 28 (Seletar / Yio Chu Kang) and is positioned in the OCR segment of the Singapore private residential market. With 186 units on a undisclosed tenure title and an expected Temporary Occupation Permit (TOP) of TBD, the development is among the new-launch cohort buyers should evaluate against alternative new-builds and resale comparables in the surrounding area. Pricing for new launches typically commands a 10–25% PSF premium over comparable resale, reflecting new-build condition, developer warranty, modern unit layouts, and the staged-payment cash-flow advantage of Progressive Payment Schemes (PPS).

For buyers, the new-launch decision turns on (a) launch-tranche pricing relative to the project’s long-run trajectory, (b) the developer’s track record on construction quality and TOP timing, (c) the surrounding-area supply pipeline (will more launches dilute pricing?), and (d) the macro rate environment between OTP and TOP — SORA can move materially in that 3–4 year window. Cross-reference District 28 (Seletar / Yio Chu Kang) pricing and use the ShiokNest price heatmap for segment-level PSF context.

The Singapore new-launch market operates under cooling-measure architecture set in April 2023: foreign-buyer Additional Buyer’s Stamp Duty at 60%, Singapore Citizen second-property ABSD at 20%, and a 55% Total Debt Servicing Ratio (TDSR) ceiling per the MAS TDSR/MSR framework. Stamp duty for POLLEN COLLECTION II is the dominant upfront cost variable: progressive Buyer’s Stamp Duty per the IRAS BSD rate table plus any applicable ABSD per the IRAS ABSD rate table. Use the BSD/ABSD stamp duty calculator to size your specific upfront cost.

Developer is Singapore United Estates (Private) Limited.. The track record of the developer — on past project TOP timing, defect-rectification responsiveness during the Defects Liability Period (DLP), and resale appreciation history of completed projects — is one of the most under-weighted variables in new-launch decisions. Buyers should request a developer track record document and cross-reference past projects via URA REALIS transaction history.

The financing context: SORA-pegged floating-rate mortgages currently price near 4.00% all-in (3.25% 3M SORA + 0.75% bank spread). Under the PPS, buyers draw the mortgage progressively as construction milestones complete, paying interest only on disbursed amounts until TOP. CPF Ordinary Account usage applies per the CPF housing usage rules, subject to the Valuation Limit and Withdrawal Limit. The URA Master Plan 2019 provides forward zoning context for surrounding plots — relevant for understanding whether the area’s built-form will intensify or remain stable over your holding period.

For: First-time buyersHDB upgraders
Source: URA REALIS
Key Takeaways
  • Project: POLLEN COLLECTION II in District 28 (Outside Central Region)
  • Developer: Singapore United Estates (Private) Limited.
  • Total units: 186
  • Sales: 27 sold of 67 launched (40.3% absorption)
  • Average median PSF: $2,610 psf

Project Overview

POLLEN COLLECTION II is a private residential development in District 28 (Outside Central Region), developed by Singapore United Estates (Private) Limited.. The project comprises 186 units.

Location Map

Project location with up to 5 of the nearest comparable condos in District 28.

  • POLLEN COLLECTION II
  • POLLEN COLLECTION II
  • LILAC PARK
  • POLLEN COLLECTION
  • MIMOSA VILLAS
  • MIMOSA VALE

Loading chart data...

Sales Performance

POLLEN COLLECTION II has sold 27 out of 67 launched units, achieving an absorption rate of 40.3%.

Monthly sales for POLLEN COLLECTION II
PeriodSoldLaunchedCumul. SoldCumul. LaunchedAvailable
May 202500000
Jun 202500000
Jul 202500000
Aug 202500000
Sep 202500000
Oct 202500000
Nov 202500000
Dec 20251752175235
Jan 202630205232
Feb 2026215226745
Mar 202650276740

Price Analysis

Price analysis for POLLEN COLLECTION II based on monthly developer sales data.

Monthly prices for POLLEN COLLECTION II
PeriodMedian PSFHighest PSFLowest PSF
Dec 2025$2,599 psf$2,617 psf$1,920 psf
Jan 2026$2,606 psf$2,630 psf$2,012 psf
Feb 2026$2,618 psf$2,620 psf$2,616 psf
Mar 2026$2,616 psf$2,628 psf$2,024 psf
Project Snapshot
POLLEN COLLECTION II by Singapore United Estates (Private) Limited. — 40.3% absorption rate with an average median PSF of $2,610 psf in District 28 (Outside Central Region).
🧮Estimate Your Monthly Payments

Sales Velocity

Monthly units sold trend for POLLEN COLLECTION II.

Sales velocity for POLLEN COLLECTION II
PeriodUnits Sold
Dec 202517
Jan 20263
Feb 20262
Mar 20265

Developer Background

Singapore United Estates (Private) Limited. is the developer of POLLEN COLLECTION II.

New-build advantages. POLLEN COLLECTION II offers modern unit layouts, contemporary facilities, full developer warranty, and the latest construction quality standards. For owner-occupiers, this translates to immediate move-in readiness without the renovation lift that resale typically requires. For investors, new-build status supports higher rental tenant preference and lower initial maintenance.

OCR positioning. The OCR segment in District 28 occupies a defined buyer cohort. OCR (Outside Central Region) is the suburban segment — the largest private residential pool by volume. OCR new launches benefit most from HDB upgrader demand and family-stage buyers prioritising space and value over CBD proximity. Use the district comparison calculator for cross-segment benchmarking.

Progressive Payment cash-flow. Under PPS, buyers pay in stages aligned with construction milestones (Foundation 10%, RC Framework 10%, Walls 5%, Roofing 5%, etc.), which spreads the cash outlay across the 3–4 year build window. This is materially different from resale where the full price clears within weeks of OTP. For yield-focused investors, the staged interest accrual on disbursed amounts only is a real cost advantage during construction. Model the cash-flow timeline via the cash flow calculator.

TOP timing risk. TBD is the expected TOP year but actual completion can slip 6–18 months on materials shortages, labour disputes, or developer cash-flow issues. Buyers committed to a TOP-aligned life event (relocation, child schooling, mortgage refinancing window) should factor a buffer. Developer track record on prior TOP timing is the best predictor; verify via past project history.

Rate-cycle risk. The 3–4 year PPS window between OTP and TOP exposes the buyer to SORA shifts. A buyer signing OTP at current 3.25% SORA could face TOP-year rates 100–200bp different in either direction. Stress-test affordability at SORA +75bp via the TDSR / MSR affordability calculator to confirm headroom under adverse rate scenarios.

Supply pipeline risk. Future GLS tranches near the project could introduce competing new launches that dilute pricing power. Check the URA GLS schedule for sites within a 1km radius of POLLEN COLLECTION II; concentrated new-supply in a fringe district can cap price appreciation during the holding period.

Resale exit risk. New launches typically command a premium over resale; on exit, the buyer becomes the resale seller competing against newer launches in the same area. Holding through and beyond the 3-year Seller’s Stamp Duty (SSD) window is structural for most buyers; shorter holds risk both SSD and weak resale clearing.

[
    {
        "persona": "Singapore Citizen first-time buyer",
        "fit_color": "green",
        "reason": "You pay 0% ABSD. OCR is the typical first-time SC entry point at S$1.0M–S$1.8M."
    },
    {
        "persona": "SC upgrader (sell HDB / decouple)",
        "fit_color": "green",
        "reason": "The 6-month ABSD remission window applies if this is your second residential property. OCR sweet spot for HDB upgraders."
    },
    {
        "persona": "SC investor (second SC property)",
        "fit_color": "amber",
        "reason": "At 20% ABSD plus 4% all-in mortgage rate, leveraged yield maths is hostile. OCR yields are slightly better but still negative-carry typical."
    },
    {
        "persona": "Permanent Resident",
        "fit_color": "amber",
        "reason": "PR pays 5% ABSD on first property. OCR/RCR is more accessible for PR upgraders."
    },
    {
        "persona": "Foreign buyer (non-FTA national)",
        "fit_color": "red",
        "reason": "At 60% ABSD, the entry-cost premium versus an SC buyer is approximately $600K+ on a S$1.0M unit. Long-horizon owner-occupier motivation only."
    },
    {
        "persona": "FTA national (US / Swiss / Liechtenstein / Norway / Iceland)",
        "fit_color": "green",
        "reason": "You qualify for SC-equivalent ABSD (0% / 20% / 30% by property number). Verify treaty eligibility with conveyancing lawyer before OTP."
    }
]

Verdict for POLLEN COLLECTION II. The project sits in a known new-launch segment with documented buyer-type fit and policy environment. The honest assessment depends on (a) launch-tranche pricing relative to comparable resale in District 28, (b) the Singapore United Estates (Private) Limited. developer track record, and (c) the buyer’s holding-horizon tolerance for the 3–4 year TOP window. For SC first-time buyers in OCR new launches, the 0% ABSD plus PPS cash-flow advantage make new-launch the often-rational choice. For SC second-property investors, the 20% ABSD plus negative-carry maths typically argues for resale value-buying instead. For foreign buyers, only owner-occupier residential motivation justifies the 60% ABSD entry. Suggested holding period: 7–10 years to amortise stamp duty and capture meaningful capital appreciation. Run total acquisition cost via the total acquisition cost calculator before committing.

Frequently Asked Questions

How many units does POLLEN COLLECTION II have?
POLLEN COLLECTION II has a total of 186 units.
What is the absorption rate for POLLEN COLLECTION II?
POLLEN COLLECTION II has an absorption rate of 40.3%, with 27 units sold out of 67 launched.
What is the average PSF for POLLEN COLLECTION II?
The average median PSF for POLLEN COLLECTION II is $2,610 psf.
What is the expected TOP for POLLEN COLLECTION II?

Expected TOP is TBD. Actual completion typically tracks the developer’s timeline within +6 months; verify current construction progress via developer sales material or URA REALIS. (as of 2026-05)

What ABSD applies to POLLEN COLLECTION II for a Singapore Citizen second-property purchase?

20% ABSD applies to a SC second residential property purchase, per the unchanged April-2023 cooling-measure schedule. On a S$2M purchase, that is S$400,000 upfront ABSD in addition to BSD of approximately S$69,600. Use the BSD/ABSD stamp duty calculator for exact figures (as of 2026-05).

Is POLLEN COLLECTION II freehold or leasehold?

The tenure is recorded as undisclosed tenure. Verify via the developer’s sales material and your conveyancing lawyer; the tenure type affects long-run resale value via lease-decay dynamics on 99-year leasehold stock.

How does PPS interest accrual work for POLLEN COLLECTION II?

Under Progressive Payment Scheme, you draw the mortgage in stages aligned with construction milestones. Interest accrues only on the disbursed amount, not the full purchase price, until TOP. Use the mortgage calculator at the current 4.00% effective rate to model staged disbursement.

What CPF can I use for POLLEN COLLECTION II?

CPF Ordinary Account funds apply to private property purchases subject to Valuation Limit (VL) and Withdrawal Limit (WL) rules. See CPF housing usage rules. The accrued-interest mechanics apply on eventual sale: principal withdrawn plus 2.5% per annum must be returned to CPF, reducing net sale proceeds.

Methodology & Sources

The dataset behind this report spans All available months; we refresh it as new data becomes available.

Transaction data sourced from URA REALIS.

  • Developer sales data from URA REALIS.
  • Median PSF, highest and lowest PSF from URA developer sales records.

Price-per-square-foot (PSF) here means the median deal in the period; means are reserved for volume-weighted aggregates explicitly labelled as such.