LIV @ MB — New Launch Profile

New Launch Profile Last reviewed

LIV @ MB sits in District 15 (Joo Chiat / Amber Road / Katong) and is positioned in the RCR segment of the Singapore private residential market. With TBD units on a undisclosed tenure title and an expected Temporary Occupation Permit (TOP) of TBD, the development is among the new-launch cohort buyers should evaluate against alternative new-builds and resale comparables in the surrounding area. Pricing for new launches typically commands a 10–25% PSF premium over comparable resale, reflecting new-build condition, developer warranty, modern unit layouts, and the staged-payment cash-flow advantage of Progressive Payment Schemes (PPS).

For buyers, the new-launch decision turns on (a) launch-tranche pricing relative to the project’s long-run trajectory, (b) the developer’s track record on construction quality and TOP timing, (c) the surrounding-area supply pipeline (will more launches dilute pricing?), and (d) the macro rate environment between OTP and TOP — SORA can move materially in that 3–4 year window. Cross-reference District 15 (Joo Chiat / Amber Road / Katong) pricing and use the ShiokNest price heatmap for segment-level PSF context.

The Singapore new-launch market operates under cooling-measure architecture set in April 2023: foreign-buyer Additional Buyer’s Stamp Duty at 60%, Singapore Citizen second-property ABSD at 20%, and a 55% Total Debt Servicing Ratio (TDSR) ceiling per the MAS TDSR/MSR framework. Stamp duty for LIV @ MB is the dominant upfront cost variable: progressive Buyer’s Stamp Duty per the IRAS BSD rate table plus any applicable ABSD per the IRAS ABSD rate table. Use the BSD/ABSD stamp duty calculator to size your specific upfront cost.

Developer is BSEL Development Pte Ltd. The track record of the developer — on past project TOP timing, defect-rectification responsiveness during the Defects Liability Period (DLP), and resale appreciation history of completed projects — is one of the most under-weighted variables in new-launch decisions. Buyers should request a developer track record document and cross-reference past projects via URA REALIS transaction history.

The financing context: SORA-pegged floating-rate mortgages currently price near 4.00% all-in (3.25% 3M SORA + 0.75% bank spread). Under the PPS, buyers draw the mortgage progressively as construction milestones complete, paying interest only on disbursed amounts until TOP. CPF Ordinary Account usage applies per the CPF housing usage rules, subject to the Valuation Limit and Withdrawal Limit. The URA Master Plan 2019 provides forward zoning context for surrounding plots — relevant for understanding whether the area’s built-form will intensify or remain stable over your holding period.

For: First-time buyersHDB upgraders
Source: URA REALIS
Key Takeaways
  • Project: LIV @ MB in District 15 (Rest of Central Region)
  • Developer: BSEL Development Pte Ltd
  • Total units: 298
  • Sales: 298 sold of 298 launched (100% absorption)
  • Average median PSF: $2,439 psf

Project Overview

LIV @ MB is a private residential development in District 15 (Rest of Central Region), developed by BSEL Development Pte Ltd. The project comprises 298 units.

Location Map

Project location with up to 5 of the nearest comparable condos in District 15.

  • LIV @ MB
  • MOUNTBATTEN LODGE
  • MOUNTBATTEN LIGHTS
  • SANTA FE MANSIONS
  • MARGATE POINT
  • LIV @ MB

Loading chart data...

Sales Performance

LIV @ MB has sold 298 out of 298 launched units, achieving an absorption rate of 100%.

Monthly sales for LIV @ MB
PeriodSoldLaunchedCumul. SoldCumul. LaunchedAvailable
Feb 20234025529843
Mar 20231025529843
Apr 20231025629842
May 20233025929839
Jun 20236026529833
Jul 202316028129817
Aug 20231202902988
Sep 2023202912987
Oct 2023602972981
Nov 2023102982980
Dec 2023002982980
Jan 2024002982980
Feb 2024002982980
Mar 2024002982980
Apr 2024002982980
May 2024002982980

Price Analysis

Price analysis for LIV @ MB based on monthly developer sales data.

Monthly prices for LIV @ MB
PeriodMedian PSFHighest PSFLowest PSF
Feb 2023$2,671 psf$2,909 psf$2,465 psf
Mar 2023$2,475 psf$2,475 psf$2,475 psf
Apr 2023$2,707 psf$2,707 psf$2,707 psf
May 2023$2,460 psf$2,587 psf$2,451 psf
Jun 2023$2,433 psf$2,554 psf$2,374 psf
Jul 2023$2,440 psf$2,520 psf$2,227 psf
Aug 2023$2,437 psf$2,641 psf$2,279 psf
Sep 2023$2,306 psf$2,434 psf$2,177 psf
Oct 2023$2,206 psf$2,565 psf$2,137 psf
Nov 2023$2,257 psf$2,257 psf$2,257 psf
Project Snapshot
LIV @ MB by BSEL Development Pte Ltd — 100% absorption rate with an average median PSF of $2,439 psf in District 15 (Rest of Central Region).
🧮Estimate Your Monthly Payments

Sales Velocity

Monthly units sold trend for LIV @ MB.

Sales velocity for LIV @ MB
PeriodUnits Sold
Feb 20234
Mar 20231
Apr 20231
May 20233
Jun 20236
Jul 202316
Aug 202312
Sep 20232
Oct 20236
Nov 20231

Developer Background

BSEL Development Pte Ltd is the developer of LIV @ MB.

New-build advantages. LIV @ MB offers modern unit layouts, contemporary facilities, full developer warranty, and the latest construction quality standards. For owner-occupiers, this translates to immediate move-in readiness without the renovation lift that resale typically requires. For investors, new-build status supports higher rental tenant preference and lower initial maintenance.

RCR positioning. The RCR segment in District 15 occupies a defined buyer cohort. RCR (Rest of Central Region) is the city-fringe segment — quality residential with reasonable CBD access at lower PSF than CCR. RCR demand is increasingly upgrader-driven as HDB owners seek private property in well-connected fringes. Use the district comparison calculator for cross-segment benchmarking.

Progressive Payment cash-flow. Under PPS, buyers pay in stages aligned with construction milestones (Foundation 10%, RC Framework 10%, Walls 5%, Roofing 5%, etc.), which spreads the cash outlay across the 3–4 year build window. This is materially different from resale where the full price clears within weeks of OTP. For yield-focused investors, the staged interest accrual on disbursed amounts only is a real cost advantage during construction. Model the cash-flow timeline via the cash flow calculator.

TOP timing risk. TBD is the expected TOP year but actual completion can slip 6–18 months on materials shortages, labour disputes, or developer cash-flow issues. Buyers committed to a TOP-aligned life event (relocation, child schooling, mortgage refinancing window) should factor a buffer. Developer track record on prior TOP timing is the best predictor; verify via past project history.

Rate-cycle risk. The 3–4 year PPS window between OTP and TOP exposes the buyer to SORA shifts. A buyer signing OTP at current 3.25% SORA could face TOP-year rates 100–200bp different in either direction. Stress-test affordability at SORA +75bp via the TDSR / MSR affordability calculator to confirm headroom under adverse rate scenarios.

Supply pipeline risk. Future GLS tranches near the project could introduce competing new launches that dilute pricing power. Check the URA GLS schedule for sites within a 1km radius of LIV @ MB; concentrated new-supply in a fringe district can cap price appreciation during the holding period.

Resale exit risk. New launches typically command a premium over resale; on exit, the buyer becomes the resale seller competing against newer launches in the same area. Holding through and beyond the 3-year Seller’s Stamp Duty (SSD) window is structural for most buyers; shorter holds risk both SSD and weak resale clearing.

[
    {
        "persona": "Singapore Citizen first-time buyer",
        "fit_color": "amber",
        "reason": "You pay 0% ABSD. RCR may stretch TDSR for median-income first-timers."
    },
    {
        "persona": "SC upgrader (sell HDB / decouple)",
        "fit_color": "green",
        "reason": "The 6-month ABSD remission window applies if this is your second residential property. Coordinate the existing-property sale carefully."
    },
    {
        "persona": "SC investor (second SC property)",
        "fit_color": "amber",
        "reason": "At 20% ABSD plus 4% all-in mortgage rate, leveraged yield maths is hostile. OCR yields are slightly better but still negative-carry typical."
    },
    {
        "persona": "Permanent Resident",
        "fit_color": "amber",
        "reason": "PR pays 5% ABSD on first property. OCR/RCR is more accessible for PR upgraders."
    },
    {
        "persona": "Foreign buyer (non-FTA national)",
        "fit_color": "red",
        "reason": "At 60% ABSD, the entry-cost premium versus an SC buyer is approximately $600K+ on a S$1.0M unit. Long-horizon owner-occupier motivation only."
    },
    {
        "persona": "FTA national (US / Swiss / Liechtenstein / Norway / Iceland)",
        "fit_color": "green",
        "reason": "You qualify for SC-equivalent ABSD (0% / 20% / 30% by property number). Verify treaty eligibility with conveyancing lawyer before OTP."
    }
]

Verdict for LIV @ MB. The project sits in a known new-launch segment with documented buyer-type fit and policy environment. The honest assessment depends on (a) launch-tranche pricing relative to comparable resale in District 15, (b) the BSEL Development Pte Ltd developer track record, and (c) the buyer’s holding-horizon tolerance for the 3–4 year TOP window. For SC first-time buyers in OCR new launches, the 0% ABSD plus PPS cash-flow advantage make new-launch the often-rational choice. For SC second-property investors, the 20% ABSD plus negative-carry maths typically argues for resale value-buying instead. For foreign buyers, only owner-occupier residential motivation justifies the 60% ABSD entry. Suggested holding period: 7–10 years to amortise stamp duty and capture meaningful capital appreciation. Run total acquisition cost via the total acquisition cost calculator before committing.

Frequently Asked Questions

How many units does LIV @ MB have?
LIV @ MB has a total of 298 units.
What is the absorption rate for LIV @ MB?
LIV @ MB has an absorption rate of 100%, with 298 units sold out of 298 launched.
What is the average PSF for LIV @ MB?
The average median PSF for LIV @ MB is $2,439 psf.
What is the expected TOP for LIV @ MB?

Expected TOP is TBD. Actual completion typically tracks the developer’s timeline within +6 months; verify current construction progress via developer sales material or URA REALIS. (as of 2026-05)

What ABSD applies to LIV @ MB for a Singapore Citizen second-property purchase?

20% ABSD applies to a SC second residential property purchase, per the unchanged April-2023 cooling-measure schedule. On a S$2M purchase, that is S$400,000 upfront ABSD in addition to BSD of approximately S$69,600. Use the BSD/ABSD stamp duty calculator for exact figures (as of 2026-05).

Is LIV @ MB freehold or leasehold?

The tenure is recorded as undisclosed tenure. Verify via the developer’s sales material and your conveyancing lawyer; the tenure type affects long-run resale value via lease-decay dynamics on 99-year leasehold stock.

How does PPS interest accrual work for LIV @ MB?

Under Progressive Payment Scheme, you draw the mortgage in stages aligned with construction milestones. Interest accrues only on the disbursed amount, not the full purchase price, until TOP. Use the mortgage calculator at the current 4.00% effective rate to model staged disbursement.

What CPF can I use for LIV @ MB?

CPF Ordinary Account funds apply to private property purchases subject to Valuation Limit (VL) and Withdrawal Limit (WL) rules. See CPF housing usage rules. The accrued-interest mechanics apply on eventual sale: principal withdrawn plus 2.5% per annum must be returned to CPF, reducing net sale proceeds.

Methodology & Sources

The dataset behind this report spans All available months; we refresh it as new data becomes available.

Transaction data sourced from URA REALIS.

  • Developer sales data from URA REALIS.
  • Median PSF, highest and lowest PSF from URA developer sales records.

Price-per-square-foot (PSF) here means the median deal in the period; means are reserved for volume-weighted aggregates explicitly labelled as such.