SORA — New Launch Profile

New Launch Profile Last reviewed

SORA sits in District 22 (Jurong East / West) and is positioned in the OCR segment of the Singapore private residential market. With 440 units on a undisclosed tenure title and an expected Temporary Occupation Permit (TOP) of TBD, the development is among the new-launch cohort buyers should evaluate against alternative new-builds and resale comparables in the surrounding area. Pricing for new launches typically commands a 10–25% PSF premium over comparable resale, reflecting new-build condition, developer warranty, modern unit layouts, and the staged-payment cash-flow advantage of Progressive Payment Schemes (PPS).

For buyers, the new-launch decision turns on (a) launch-tranche pricing relative to the project’s long-run trajectory, (b) the developer’s track record on construction quality and TOP timing, (c) the surrounding-area supply pipeline (will more launches dilute pricing?), and (d) the macro rate environment between OTP and TOP — SORA can move materially in that 3–4 year window. Cross-reference District 22 (Jurong East / West) pricing and use the ShiokNest price heatmap for segment-level PSF context.

The Singapore new-launch market operates under cooling-measure architecture set in April 2023: foreign-buyer Additional Buyer’s Stamp Duty at 60%, Singapore Citizen second-property ABSD at 20%, and a 55% Total Debt Servicing Ratio (TDSR) ceiling per the MAS TDSR/MSR framework. Stamp duty for SORA is the dominant upfront cost variable: progressive Buyer’s Stamp Duty per the IRAS BSD rate table plus any applicable ABSD per the IRAS ABSD rate table. Use the BSD/ABSD stamp duty calculator to size your specific upfront cost.

Developer is Lakeside Residential Pte Ltd. The track record of the developer — on past project TOP timing, defect-rectification responsiveness during the Defects Liability Period (DLP), and resale appreciation history of completed projects — is one of the most under-weighted variables in new-launch decisions. Buyers should request a developer track record document and cross-reference past projects via URA REALIS transaction history.

The financing context: SORA-pegged floating-rate mortgages currently price near 4.00% all-in (3.25% 3M SORA + 0.75% bank spread). Under the PPS, buyers draw the mortgage progressively as construction milestones complete, paying interest only on disbursed amounts until TOP. CPF Ordinary Account usage applies per the CPF housing usage rules, subject to the Valuation Limit and Withdrawal Limit. The URA Master Plan 2019 provides forward zoning context for surrounding plots — relevant for understanding whether the area’s built-form will intensify or remain stable over your holding period.

For: First-time buyersHDB upgraders
Source: URA REALIS
Key Takeaways
  • Project: SORA in District 22 (Outside Central Region)
  • Developer: Lakeside Residential Pte Ltd
  • Total units: 440
  • Sales: 210 sold of 440 launched (47.7% absorption)
  • Average median PSF: $2,291 psf

Project Overview

SORA is a private residential development in District 22 (Outside Central Region), developed by Lakeside Residential Pte Ltd. The project comprises 440 units.

Location Map

Project location with up to 5 of the nearest comparable condos in District 22.

  • SORA
  • SORA
  • THE LAKEGARDEN RESIDENCES
  • LAKESIDE TOWER
  • LAKE LIFE
  • LAKESIDE GROVE

Loading chart data...

Sales Performance

SORA has sold 210 out of 440 launched units, achieving an absorption rate of 47.7%.

Monthly sales for SORA
PeriodSoldLaunchedCumul. SoldCumul. LaunchedAvailable
Jan 202400000
Feb 202400000
Mar 202400000
Apr 202400000
May 202400000
Jun 202400000
Jul 2024107320103320217
Aug 202450103320217
Sep 202440111320209
Oct 202480111320209
Nov 2024160134320186
Dec 2024100145320175
Jan 202580153320167
Feb 2025180156320164
Mar 2025190185440255
Apr 202530186440254
May 202540190440250
Jun 202570194440246
Jul 202530197440243
Aug 202500197440243
Sep 202500197440243
Oct 202500197440243
Nov 202520201440239
Dec 202500201440239
Jan 202650206440234
Feb 202650209440231
Mar 202620210440230

Price Analysis

Price analysis for SORA based on monthly developer sales data.

Monthly prices for SORA
PeriodMedian PSFHighest PSFLowest PSF
Jul 2024$2,153 psf$2,502 psf$1,851 psf
Aug 2024$2,215 psf$2,320 psf$1,961 psf
Sep 2024$2,314 psf$2,356 psf$2,246 psf
Oct 2024$2,312 psf$2,393 psf$2,157 psf
Nov 2024$2,226 psf$2,402 psf$1,987 psf
Dec 2024$2,198 psf$2,294 psf$2,041 psf
Jan 2025$2,235 psf$2,553 psf$2,142 psf
Feb 2025$2,304 psf$2,403 psf$2,109 psf
Mar 2025$2,320 psf$2,504 psf$1,981 psf
Apr 2025$2,238 psf$2,281 psf$1,987 psf
May 2025$2,273 psf$2,385 psf$2,153 psf
Jun 2025$2,270 psf$2,400 psf$2,148 psf
Jul 2025$2,369 psf$2,529 psf$2,266 psf
Nov 2025$2,456 psf$2,566 psf$2,346 psf
Jan 2026$2,304 psf$2,466 psf$2,126 psf
Feb 2026$2,275 psf$2,566 psf$2,138 psf
Mar 2026$2,480 psf$2,505 psf$2,455 psf
Project Snapshot
SORA by Lakeside Residential Pte Ltd — 47.7% absorption rate with an average median PSF of $2,291 psf in District 22 (Outside Central Region).
🧮Estimate Your Monthly Payments

Sales Velocity

Monthly units sold trend for SORA.

Sales velocity for SORA
PeriodUnits Sold
Jul 2024107
Aug 20245
Sep 20244
Oct 20248
Nov 202416
Dec 202410
Jan 20258
Feb 202518
Mar 202519
Apr 20253
May 20254
Jun 20257
Jul 20253
Nov 20252
Jan 20265
Feb 20265
Mar 20262

Developer Background

Lakeside Residential Pte Ltd is the developer of SORA.

New-build advantages. SORA offers modern unit layouts, contemporary facilities, full developer warranty, and the latest construction quality standards. For owner-occupiers, this translates to immediate move-in readiness without the renovation lift that resale typically requires. For investors, new-build status supports higher rental tenant preference and lower initial maintenance.

OCR positioning. The OCR segment in District 22 occupies a defined buyer cohort. OCR (Outside Central Region) is the suburban segment — the largest private residential pool by volume. OCR new launches benefit most from HDB upgrader demand and family-stage buyers prioritising space and value over CBD proximity. Use the district comparison calculator for cross-segment benchmarking.

Progressive Payment cash-flow. Under PPS, buyers pay in stages aligned with construction milestones (Foundation 10%, RC Framework 10%, Walls 5%, Roofing 5%, etc.), which spreads the cash outlay across the 3–4 year build window. This is materially different from resale where the full price clears within weeks of OTP. For yield-focused investors, the staged interest accrual on disbursed amounts only is a real cost advantage during construction. Model the cash-flow timeline via the cash flow calculator.

TOP timing risk. TBD is the expected TOP year but actual completion can slip 6–18 months on materials shortages, labour disputes, or developer cash-flow issues. Buyers committed to a TOP-aligned life event (relocation, child schooling, mortgage refinancing window) should factor a buffer. Developer track record on prior TOP timing is the best predictor; verify via past project history.

Rate-cycle risk. The 3–4 year PPS window between OTP and TOP exposes the buyer to SORA shifts. A buyer signing OTP at current 3.25% SORA could face TOP-year rates 100–200bp different in either direction. Stress-test affordability at SORA +75bp via the TDSR / MSR affordability calculator to confirm headroom under adverse rate scenarios.

Supply pipeline risk. Future GLS tranches near the project could introduce competing new launches that dilute pricing power. Check the URA GLS schedule for sites within a 1km radius of SORA; concentrated new-supply in a fringe district can cap price appreciation during the holding period.

Resale exit risk. New launches typically command a premium over resale; on exit, the buyer becomes the resale seller competing against newer launches in the same area. Holding through and beyond the 3-year Seller’s Stamp Duty (SSD) window is structural for most buyers; shorter holds risk both SSD and weak resale clearing.

[
    {
        "persona": "Singapore Citizen first-time buyer",
        "fit_color": "green",
        "reason": "You pay 0% ABSD. OCR is the typical first-time SC entry point at S$1.0M–S$1.8M."
    },
    {
        "persona": "SC upgrader (sell HDB / decouple)",
        "fit_color": "green",
        "reason": "The 6-month ABSD remission window applies if this is your second residential property. OCR sweet spot for HDB upgraders."
    },
    {
        "persona": "SC investor (second SC property)",
        "fit_color": "amber",
        "reason": "At 20% ABSD plus 4% all-in mortgage rate, leveraged yield maths is hostile. OCR yields are slightly better but still negative-carry typical."
    },
    {
        "persona": "Permanent Resident",
        "fit_color": "amber",
        "reason": "PR pays 5% ABSD on first property. OCR/RCR is more accessible for PR upgraders."
    },
    {
        "persona": "Foreign buyer (non-FTA national)",
        "fit_color": "red",
        "reason": "At 60% ABSD, the entry-cost premium versus an SC buyer is approximately $600K+ on a S$1.0M unit. Long-horizon owner-occupier motivation only."
    },
    {
        "persona": "FTA national (US / Swiss / Liechtenstein / Norway / Iceland)",
        "fit_color": "green",
        "reason": "You qualify for SC-equivalent ABSD (0% / 20% / 30% by property number). Verify treaty eligibility with conveyancing lawyer before OTP."
    }
]

Verdict for SORA. The project sits in a known new-launch segment with documented buyer-type fit and policy environment. The honest assessment depends on (a) launch-tranche pricing relative to comparable resale in District 22, (b) the Lakeside Residential Pte Ltd developer track record, and (c) the buyer’s holding-horizon tolerance for the 3–4 year TOP window. For SC first-time buyers in OCR new launches, the 0% ABSD plus PPS cash-flow advantage make new-launch the often-rational choice. For SC second-property investors, the 20% ABSD plus negative-carry maths typically argues for resale value-buying instead. For foreign buyers, only owner-occupier residential motivation justifies the 60% ABSD entry. Suggested holding period: 7–10 years to amortise stamp duty and capture meaningful capital appreciation. Run total acquisition cost via the total acquisition cost calculator before committing.

Frequently Asked Questions

How many units does SORA have?
SORA has a total of 440 units.
What is the absorption rate for SORA?
SORA has an absorption rate of 47.7%, with 210 units sold out of 440 launched.
What is the average PSF for SORA?
The average median PSF for SORA is $2,291 psf.
What is the expected TOP for SORA?

Expected TOP is TBD. Actual completion typically tracks the developer’s timeline within +6 months; verify current construction progress via developer sales material or URA REALIS. (as of 2026-05)

What ABSD applies to SORA for a Singapore Citizen second-property purchase?

20% ABSD applies to a SC second residential property purchase, per the unchanged April-2023 cooling-measure schedule. On a S$2M purchase, that is S$400,000 upfront ABSD in addition to BSD of approximately S$69,600. Use the BSD/ABSD stamp duty calculator for exact figures (as of 2026-05).

Is SORA freehold or leasehold?

The tenure is recorded as undisclosed tenure. Verify via the developer’s sales material and your conveyancing lawyer; the tenure type affects long-run resale value via lease-decay dynamics on 99-year leasehold stock.

How does PPS interest accrual work for SORA?

Under Progressive Payment Scheme, you draw the mortgage in stages aligned with construction milestones. Interest accrues only on the disbursed amount, not the full purchase price, until TOP. Use the mortgage calculator at the current 4.00% effective rate to model staged disbursement.

What CPF can I use for SORA?

CPF Ordinary Account funds apply to private property purchases subject to Valuation Limit (VL) and Withdrawal Limit (WL) rules. See CPF housing usage rules. The accrued-interest mechanics apply on eventual sale: principal withdrawn plus 2.5% per annum must be returned to CPF, reducing net sale proceeds.

Methodology & Sources

The dataset behind this report spans All available months; we refresh it as new data becomes available.

Transaction data sourced from URA REALIS.

  • Developer sales data from URA REALIS.
  • Median PSF, highest and lowest PSF from URA developer sales records.

Price-per-square-foot (PSF) here means the median deal in the period; means are reserved for volume-weighted aggregates explicitly labelled as such.