19 NASSIM — New Launch Profile

New Launch Profile Last reviewed

19 NASSIM sits in District 10 (Bukit Timah / Holland / Tanglin) and is positioned in the CCR segment of the Singapore private residential market. With TBD units on a undisclosed tenure title and an expected Temporary Occupation Permit (TOP) of TBD, the development is among the new-launch cohort buyers should evaluate against alternative new-builds and resale comparables in the surrounding area. Pricing for new launches typically commands a 10–25% PSF premium over comparable resale, reflecting new-build condition, developer warranty, modern unit layouts, and the staged-payment cash-flow advantage of Progressive Payment Schemes (PPS).

For buyers, the new-launch decision turns on (a) launch-tranche pricing relative to the project’s long-run trajectory, (b) the developer’s track record on construction quality and TOP timing, (c) the surrounding-area supply pipeline (will more launches dilute pricing?), and (d) the macro rate environment between OTP and TOP — SORA can move materially in that 3–4 year window. Cross-reference District 10 (Bukit Timah / Holland / Tanglin) pricing and use the ShiokNest price heatmap for segment-level PSF context.

The Singapore new-launch market operates under cooling-measure architecture set in April 2023: foreign-buyer Additional Buyer’s Stamp Duty at 60%, Singapore Citizen second-property ABSD at 20%, and a 55% Total Debt Servicing Ratio (TDSR) ceiling per the MAS TDSR/MSR framework. Stamp duty for 19 NASSIM is the dominant upfront cost variable: progressive Buyer’s Stamp Duty per the IRAS BSD rate table plus any applicable ABSD per the IRAS ABSD rate table. Use the BSD/ABSD stamp duty calculator to size your specific upfront cost.

Developer is Parksville Development Pte Ltd. The track record of the developer — on past project TOP timing, defect-rectification responsiveness during the Defects Liability Period (DLP), and resale appreciation history of completed projects — is one of the most under-weighted variables in new-launch decisions. Buyers should request a developer track record document and cross-reference past projects via URA REALIS transaction history.

The financing context: SORA-pegged floating-rate mortgages currently price near 4.00% all-in (3.25% 3M SORA + 0.75% bank spread). Under the PPS, buyers draw the mortgage progressively as construction milestones complete, paying interest only on disbursed amounts until TOP. CPF Ordinary Account usage applies per the CPF housing usage rules, subject to the Valuation Limit and Withdrawal Limit. The URA Master Plan 2019 provides forward zoning context for surrounding plots — relevant for understanding whether the area’s built-form will intensify or remain stable over your holding period.

For: First-time buyersHDB upgraders
Source: URA REALIS
Key Takeaways
  • Project: 19 NASSIM in District 10 (Core Central Region)
  • Developer: Parksville Development Pte Ltd
  • Total units: 101
  • Sales: 75 sold of 101 launched (74.3% absorption)
  • Average median PSF: $3,450 psf

Project Overview

19 NASSIM is a private residential development in District 10 (Core Central Region), developed by Parksville Development Pte Ltd. The project comprises 101 units.

Location Map

Project location with up to 5 of the nearest comparable condos in District 10.

  • 19 NASSIM
  • 19 NASSIM
  • 8 NAPIER
  • THE LOFT
  • THE NASSIM
  • NASSIM PARK RESIDENCES

Loading chart data...

Sales Performance

19 NASSIM has sold 75 out of 101 launched units, achieving an absorption rate of 74.3%.

Monthly sales for 19 NASSIM
PeriodSoldLaunchedCumul. SoldCumul. LaunchedAvailable
Feb 20231062519
Mar 20230062519
Apr 20230062519
May 20230062519
Jun 20230062519
Jul 20230062519
Aug 20230062519
Sep 20230062519
Oct 20230062519
Nov 202350112514
Dec 202320132512
Jan 20245016259
Feb 2024415194021
Mar 20241120316029
Apr 202440366024
May 202460416019
Jun 202440456015
Jul 202420476013
Aug 20245415210149
Sep 2024305510146
Oct 2024305810143
Nov 2024506310138
Dec 2024306510136
Jan 2025106610135
Feb 2025507110130
Mar 2025407510126

Price Analysis

Price analysis for 19 NASSIM based on monthly developer sales data.

Monthly prices for 19 NASSIM
PeriodMedian PSFHighest PSFLowest PSF
Feb 2023$3,906 psf$3,906 psf$3,906 psf
Nov 2023$3,396 psf$3,574 psf$3,036 psf
Dec 2023$3,510 psf$3,565 psf$3,454 psf
Jan 2024$3,462 psf$3,819 psf$3,182 psf
Feb 2024$3,392 psf$3,588 psf$3,280 psf
Mar 2024$3,304 psf$3,397 psf$3,001 psf
Apr 2024$3,309 psf$3,640 psf$3,278 psf
May 2024$3,373 psf$3,635 psf$3,247 psf
Jun 2024$3,361 psf$3,566 psf$3,200 psf
Jul 2024$3,646 psf$3,697 psf$3,595 psf
Aug 2024$3,477 psf$3,681 psf$3,397 psf
Sep 2024$3,608 psf$3,764 psf$3,483 psf
Oct 2024$3,570 psf$3,652 psf$3,381 psf
Nov 2024$3,247 psf$3,390 psf$2,957 psf
Dec 2024$3,243 psf$3,530 psf$3,154 psf
Jan 2025$3,451 psf$3,451 psf$3,451 psf
Feb 2025$3,372 psf$3,641 psf$3,207 psf
Mar 2025$3,464 psf$3,716 psf$3,439 psf
Project Snapshot
19 NASSIM by Parksville Development Pte Ltd — 74.3% absorption rate with an average median PSF of $3,450 psf in District 10 (Core Central Region).
🧮Estimate Your Monthly Payments

Sales Velocity

Monthly units sold trend for 19 NASSIM.

Sales velocity for 19 NASSIM
PeriodUnits Sold
Feb 20231
Nov 20235
Dec 20232
Jan 20245
Feb 20244
Mar 202411
Apr 20244
May 20246
Jun 20244
Jul 20242
Aug 20245
Sep 20243
Oct 20243
Nov 20245
Dec 20243
Jan 20251
Feb 20255
Mar 20254

Developer Background

Parksville Development Pte Ltd is the developer of 19 NASSIM.

New-build advantages. 19 NASSIM offers modern unit layouts, contemporary facilities, full developer warranty, and the latest construction quality standards. For owner-occupiers, this translates to immediate move-in readiness without the renovation lift that resale typically requires. For investors, new-build status supports higher rental tenant preference and lower initial maintenance.

CCR positioning. The CCR segment in District 10 occupies a defined buyer cohort. CCR (Core Central Region) is the prime residential segment — Districts 9, 10, 11 plus parts of D1, D2, D4. Foreign-buyer demand has structurally contracted under the 60% ABSD, but Singapore Citizen and PR demand for CCR luxury remains anchored to wealth-storage and trophy-asset motivations. Use the district comparison calculator for cross-segment benchmarking.

Progressive Payment cash-flow. Under PPS, buyers pay in stages aligned with construction milestones (Foundation 10%, RC Framework 10%, Walls 5%, Roofing 5%, etc.), which spreads the cash outlay across the 3–4 year build window. This is materially different from resale where the full price clears within weeks of OTP. For yield-focused investors, the staged interest accrual on disbursed amounts only is a real cost advantage during construction. Model the cash-flow timeline via the cash flow calculator.

TOP timing risk. TBD is the expected TOP year but actual completion can slip 6–18 months on materials shortages, labour disputes, or developer cash-flow issues. Buyers committed to a TOP-aligned life event (relocation, child schooling, mortgage refinancing window) should factor a buffer. Developer track record on prior TOP timing is the best predictor; verify via past project history.

Rate-cycle risk. The 3–4 year PPS window between OTP and TOP exposes the buyer to SORA shifts. A buyer signing OTP at current 3.25% SORA could face TOP-year rates 100–200bp different in either direction. Stress-test affordability at SORA +75bp via the TDSR / MSR affordability calculator to confirm headroom under adverse rate scenarios.

Supply pipeline risk. Future GLS tranches near the project could introduce competing new launches that dilute pricing power. Check the URA GLS schedule for sites within a 1km radius of 19 NASSIM; concentrated new-supply in a fringe district can cap price appreciation during the holding period.

Resale exit risk. New launches typically command a premium over resale; on exit, the buyer becomes the resale seller competing against newer launches in the same area. Holding through and beyond the 3-year Seller’s Stamp Duty (SSD) window is structural for most buyers; shorter holds risk both SSD and weak resale clearing.

[
    {
        "persona": "Singapore Citizen first-time buyer",
        "fit_color": "red",
        "reason": "You pay 0% ABSD. CCR luxury is rarely a first-time SC entry given the absolute price."
    },
    {
        "persona": "SC upgrader (sell HDB / decouple)",
        "fit_color": "green",
        "reason": "The 6-month ABSD remission window applies if this is your second residential property. Coordinate the existing-property sale carefully."
    },
    {
        "persona": "SC investor (second SC property)",
        "fit_color": "amber",
        "reason": "At 20% ABSD plus 4% all-in mortgage rate, leveraged yield maths is hostile. CCR yields rarely cover SORA-pegged carry."
    },
    {
        "persona": "Permanent Resident",
        "fit_color": "amber",
        "reason": "PR pays 5% ABSD on first property. CCR luxury is the historical PR entry segment."
    },
    {
        "persona": "Foreign buyer (non-FTA national)",
        "fit_color": "red",
        "reason": "At 60% ABSD, the entry-cost premium versus an SC buyer is approximately $1.5M+ on a S$2.5M unit. Long-horizon owner-occupier motivation only."
    },
    {
        "persona": "FTA national (US / Swiss / Liechtenstein / Norway / Iceland)",
        "fit_color": "green",
        "reason": "You qualify for SC-equivalent ABSD (0% / 20% / 30% by property number). Verify treaty eligibility with conveyancing lawyer before OTP."
    }
]

Verdict for 19 NASSIM. The project sits in a known new-launch segment with documented buyer-type fit and policy environment. The honest assessment depends on (a) launch-tranche pricing relative to comparable resale in District 10, (b) the Parksville Development Pte Ltd developer track record, and (c) the buyer’s holding-horizon tolerance for the 3–4 year TOP window. For SC first-time buyers in OCR new launches, the 0% ABSD plus PPS cash-flow advantage make new-launch the often-rational choice. For SC second-property investors, the 20% ABSD plus negative-carry maths typically argues for resale value-buying instead. For foreign buyers, only owner-occupier residential motivation justifies the 60% ABSD entry. Suggested holding period: 7–10 years to amortise stamp duty and capture meaningful capital appreciation. Run total acquisition cost via the total acquisition cost calculator before committing.

Frequently Asked Questions

How many units does 19 NASSIM have?
19 NASSIM has a total of 101 units.
What is the absorption rate for 19 NASSIM?
19 NASSIM has an absorption rate of 74.3%, with 75 units sold out of 101 launched.
What is the average PSF for 19 NASSIM?
The average median PSF for 19 NASSIM is $3,450 psf.
What is the expected TOP for 19 NASSIM?

Expected TOP is TBD. Actual completion typically tracks the developer’s timeline within +6 months; verify current construction progress via developer sales material or URA REALIS. (as of 2026-05)

What ABSD applies to 19 NASSIM for a Singapore Citizen second-property purchase?

20% ABSD applies to a SC second residential property purchase, per the unchanged April-2023 cooling-measure schedule. On a S$2M purchase, that is S$400,000 upfront ABSD in addition to BSD of approximately S$69,600. Use the BSD/ABSD stamp duty calculator for exact figures (as of 2026-05).

Is 19 NASSIM freehold or leasehold?

The tenure is recorded as undisclosed tenure. Verify via the developer’s sales material and your conveyancing lawyer; the tenure type affects long-run resale value via lease-decay dynamics on 99-year leasehold stock.

How does PPS interest accrual work for 19 NASSIM?

Under Progressive Payment Scheme, you draw the mortgage in stages aligned with construction milestones. Interest accrues only on the disbursed amount, not the full purchase price, until TOP. Use the mortgage calculator at the current 4.00% effective rate to model staged disbursement.

What CPF can I use for 19 NASSIM?

CPF Ordinary Account funds apply to private property purchases subject to Valuation Limit (VL) and Withdrawal Limit (WL) rules. See CPF housing usage rules. The accrued-interest mechanics apply on eventual sale: principal withdrawn plus 2.5% per annum must be returned to CPF, reducing net sale proceeds.

Methodology & Sources

The dataset behind this report spans All available months; we refresh it as new data becomes available.

Transaction data sourced from URA REALIS.

  • Developer sales data from URA REALIS.
  • Median PSF, highest and lowest PSF from URA developer sales records.

Price-per-square-foot (PSF) here means the median deal in the period; means are reserved for volume-weighted aggregates explicitly labelled as such.